Deyang Rata Launches 2000 kW Load Bank for Generator Testing
Deyang Rata Technology has introduced a 2000 kW resistive load bank built to test large generator sets, UPS systems, data centers and industrial power infrastructure. The container-type unit, launched in August 2026, is aimed at high-power commissioning and maintenance work, including applications in Germany.
Why it matters: - High-capacity load banks let operators test power systems under controlled electrical loads before commissioning or during maintenance. - The 2000 kW rating targets large generator sets, backup power systems and industrial installations that need higher-voltage testing. - Germany is an identified target market, pointing to use in industrial power systems, data centers and power engineering projects.
What happened: - Deyang Rata Technology Co., Ltd. introduced a 2000 kW Resistive Load Bank for Generator Set Testing. - The container-type load bank was launched in August 2026 in Deyang. - The system is designed for large generator sets, UPS equipment, data centers and industrial power systems.
The details: - The load bank is rated at 2000 kW and 730 Vac. - The unit operates at a power factor of 1.0 and a frequency of 50 Hz. - The electrical configuration is three-phase, three-wire, or 3P3W. - Load steps include two 100 kW stages and nine 200 kW stages. - The staged setup supports phased load testing at different power levels. - The unit is intended for generator commissioning, backup power verification, industrial power supply testing and power system maintenance. - The enclosure uses a canopy or container-style design for outdoor installation and on-site testing. - Cooling uses a horizontal air exhaust configuration and six fans. - The specified airflow capacity is 70 cubic meters per kilowatt-hour. - The stated noise level is no more than 70 decibels at a distance of seven meters. - The unit measures 2,300 mm wide, 3,600 mm deep and 2,050 mm high. - The load bank weighs about 2,500 kilograms. - Lifting lugs and locking points support transportation and installation. - The enclosure carries IP54 protection for the full unit and IP55 protection for the control chamber. - The control system supports local and remote intelligent control. - The control voltage is 400 Vac. - The electrical design includes copper busbar load connections, a load element tolerance of ±3% and a short-term operating voltage tolerance of +5%. - The manufacturing process includes preparation, material selection, load module processing, control unit assembly, heat dissipation system construction, circuit wiring and enclosure assembly. - Completed units undergo functional debugging and quality inspection, including testing under extreme environmental conditions.
Between the lines: - The product is built for field deployment, not just lab testing, because the container-style enclosure, cooling system and lifting hardware support outdoor and on-site use. - The staged load design gives testing teams more flexibility when simulating real operating conditions across different load levels. - The Germany market focus suggests Deyang Rata is aiming at industrial buyers that need repeatable commissioning and maintenance tools for critical power infrastructure.
What's next: - Deyang Rata says the product will support industrial power systems, data center infrastructure, generator testing facilities and power engineering projects in Germany. - The company is positioning the load bank as part of its broader power supply testing solutions portfolio. - Interested buyers can contact Deyang Rata Technology Co., Ltd. for product information.
The bottom line: - Deyang Rata is adding a high-capacity resistive load bank designed for controlled, real-world testing of large power systems before they go live or return to service.
Disclaimer: This article was produced by AGP Wire with the assistance of artificial intelligence based on original source content and has been refined to improve clarity, structure, and readability. This content is provided on an “as is” basis. While care has been taken in its preparation, it may contain inaccuracies or omissions, and readers should consult the original source and independently verify key information where appropriate. This content is for informational purposes only and does not constitute legal, financial, investment, or other professional advice.
Sign up for:
Finance Times Gazette
The daily local news briefing you can trust. Every day. Subscribe now.
Check Your Email!
We sent a one-time activation link to: .
Confirm it's you by clicking the email link.
If the email is not in your inbox, check spam or try again.
Welcome back!
is already signed up. Check your inbox for updates.